FACTSHEET - PROVINCIAL ASSEMBLY OF PUNJAB SESSION 5 SITTING 5
FACTSHEET - PROVINCIAL ASSEMBLY OF PUNJAB SESSION 5 SITTING 4
FACTSHEET - PROVINCIAL ASSEMBLY OF PUNJAB SESSION 5 SITTING 3
FACTSHEET - PROVINCIAL ASSEMBLY OF PUNJAB SESSION 5 SITTING 2
FACTSHEET - PROVINCIAL ASSEMBLY OF PUNJAB SESSION 5 SITTING 1
FACTSHEET - PROVINCIAL ASSEMBLY OF PUNJAB SESSION 4 SITTING 1
FACTSHEET - NATIONAL ASSEMBLY OF PAKISTAN SESSION 1 SITTING 7
FACTSHEET - NATIONAL ASSEMBLY OF PAKISTAN SESSION 1 SITTING 6
FACTSHEET - PROVINCIAL ASSEMBLY OF PUNJAB SESSION 3 SITTING 1
FACTSHEET - PROVINCIAL ASSEMBLY OF SINDH SESSION 2 SITTING 1
FACTSHEET - NATIONAL ASSEMBLY OF PAKISTAN SESSION 1 SITTING 4
Assembly | Parliamentary Year | Session No. | Sitting No. | Question | Question Type | Ministry |
---|---|---|---|---|---|---|
Assembly | Parliamentary Year | Session No | Sitting No. | Question | Question Type | Ministry |
National | 3 | 28 | 8 |
Will the Minister for Energy (Power Division) be pleased to state:
(a) the increase in the overall collection of power sector due to addition of electricity in the national grid during last five years; and
(b) whether such addition of electricity to national grid is sufficient to overcome load shedding in the country?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
Will the Minister for Energy (Power Division) be pleased to state:
(a) the price of electricity being paid by a consumer upon consuming 300 units per month at present and the break-up taxes, duties and other charges, which are charged upon such 300 units;
(b) detail subsidy which is provided to consumers, consuming 300 units and criteria by which such subsidy is distributed among them; and
(c) the rate of the average bill of electricity of per month of 300 units, as of March, 2013 May 2018 and also at present?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
Will the Minister for Energy (Power Division) be pleased to state:
(a) whether an “agreement” or Memorandum of Understanding, signed between a group of power producing companies and Government, recently;
(b) if it is an agreement, as referred by the Prime Minister, the details thereof;
(c) if it is a MOU, the stage-wise details of measures, which need to do by both sides to reach an agreement at a later point in time;
(d) how did or will the matter of alleged “excessive profits” that is said to make by such power producing companies by misrepresenting their costs or their fuel consumption or their efficiency levels, address in the aforesaid agreement or MOU; and
(e) up to what extent, such agreement or MOU will be effective to reduce power bills of consumers alongwith its details thereof and the manner in which same will be worked out in terms of above?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
Will the Minister for Energy (Power Division) be pleased to state the names of agreements signed by the Government with Independent Power Producers along with the conditions thereof in detail?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
Will the Minister for Energy (Power Division) be pleased to state:
(a) how long more, Neelum-Jhelum (NJ) surcharges will be collected or remain enforced alongwith date of collection;
(b) whether it is a fact that over and above collection is being made under the head of NJ surcharge from consumers; if so, the justification thereof;
(c) is there any legal statutes, which empowers the Government to make such collection up till now;
(d) the estimated over and above collection in recent years; and
(e) whether there is any proposal under consideration of the Government to refund over and above collection of NJ surcharge; if so, the details thereof; if not, the reasons thereof?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
Will the Minister for Energy (Power Division) be pleased to state:
(a) the quantum alongwith rate of electricity purchased from Independent Power Producers during the year 2018-19; and
(b) the price fixed for said electricity which is being sold out to the consumers?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
Will the Minister for Human Rights be pleased to state:
(a) whether, Ministry or Human Rights Commission of Pakistan has taken notice that large number of people languishing in jails as their appeals are pending in respective appellate forums;
(b) if so, the province and jail-wise number of such persons, who have been languishing in jails upon pendency of their appeals in respective appellate forums for the last three years or more; and
(c) what steps are being taken by Government to formulate a comprehensive policy with collaboration of Provincial Governments to pay fines of such persons and ensure their release from jails?
|
Starred | Human Rights |
National | 3 | 28 | 8 |
Will the Minister for Energy (Power Division) be pleased to state:
(a) the district-wise ratio of area of each district of Balochistan which has facility of electricity;
(b) whether it is a fact that most of areas of Balochistan does not have facility of electricity;
(c) if so, the reasons thereof; and
(d) what steps are being taken by the Government to provide electricity in such areas at earliest?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
Will the Minister for Energy (Petroleum Division) be pleased to state:
(a) the amount which has been paid regarding the purchase of price of lands, houses and forest etc. to the each affected family by the Government and Oil and Gas Development Company Limited (OGDCL) at Kazzoba, Tehsil and Sub-Division Batani merger area FR Luky Marwat alongwith the procedure adopted to pay the said amount; and
(b) the expenditure incurred upon the welfare and development of the local tribal community from the Federal Government and OGDCL and company included in the agreement alongwith the detail of names and sources from where the amount has been paid for the said expenditures?
|
Starred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
Will the Minister for Energy (Power Division) be pleased to state:
(a) whether it is a fact that a person was died and another was injured due to electrocution while relocating electricity polls in NA-183, recently; if so, the details thereof;
(b) whether such relocation was approved from concerned authorities;
(c) whether safety measures were taken prior to make such relocation of polls;
(d) whether the aforesaid persons were employees of the relevant Sub-Division, where such relocation of polls was carrying out; if not, why were such employees allowed to work in another area of their duty place;
(e) whether such matter was investigated; if so, the details thereof;
(f) whether aforesaid persons have been compensated; and
(g) if so, the details thereof; if not, the reasons thereof?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
Will the Minister for Energy (Power Division) be pleased to state:
(a) whether it is a fact that irregularities of trillions of rupees, both administrative and financial, which have been pointed out in power sector by the Government’s auditors in the year 2019-20 are confirmed proof of poor administration and Governance of incumbent Government in the power sector;
(b) whether it is also a fact that public at large had to pay the price of such institutional negligence in terms of increasing electricity tariff;
(c) if the answers to part (a) and (b) above are in affirmative, whether the responsible held accountable by departments concerned; if so, the details thereof; if not, the reasons thereof; and
(d) what corrective measures are being taken particular with reference to not transfer or shift the burden of such institutional negligence to general public?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
Will the Minister for Energy (Power Division) be pleased to state:
(a) what is the amount of circular debt at present along with the amount of circular debt for the last ten years on annual basis;
(b) whether it is a fact that the circular debt is growing 60% annually and would be doubled by 2025 as estimated by an independent study; if so, reasons thereof; and
(c) what steps are being taken by the Government to deal with this issue on a permanent basis?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
Will the Minister for Energy (Power Division) be pleased to state:
(a) the steps being taken by the Government to ensure the supply of electricity in Kohat City and adjacent areas;
(b) the minimum duration of loadshedding in the city and its far flung areas; and
(c) the action being taken to further minimize the duration thereof?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
Will the Minister for Energy (Petroleum Division) be pleased to state:
(a) whether there is any plan or policy introduced by the Government to provide employment from natural resources in Balochistan;
(b) if so, the details; if not, reasons thereof?
|
Starred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
Will the Minister for Energy (Power Division) be pleased to state the steps being taken by the Government to resolve power related issues, modalities for its reforms?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
(a) whether it is a fact that all national and international agreements and contracts are vetted by the Ministry;
(b) whether the Ministry has required manpower to do the aforesaid task; if so, the details of persons, which have been posted in the relevant wing alongwith expertise of each, particular with reference to their experience in the subjects international law and writing of international agreements and contracts; and
(c) what steps are being taken to strengthen the wing, particularly with reference to recent decisions of international arbitrators and forums given against Pakistan?
|
Starred | Law and Justice |
National | 3 | 28 | 8 |
(a) the disco-wise number of either new schemes of electrification or extension in existing set up electricity have been or to be carried out during the financial years 2018-19, 2019-20 and 2020-21, separately;
(b) the exact location of the area, where such electrification or extension has been or to be made and the name of the National Assembly Constituency, in which such area falls;
(c) the entity, who provided the required funds for such electrification or extension; and
(d) the role of sitting MNA in such electrification or extension?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
(a) whether it is a fact that several persons, associated with several Sports Wings of SNGPL and SSGC, have been inducted/ employed;
(b) whether it is also a fact that they have been removed from their services, in near past;
(c) if so, the details of such inducted persons alongwith relevant field of Sport, with which they were associated;
(d) the reasons for the removal of such persons;
(e) is there any proposal under consideration of the Government to restore their services;
(f) if so, the details thereof; if not, the reasons thereof?
|
Starred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
Will the Minister for Communications be pleased to state the time by which dualization of the Indus Highway from Peshawar to Gandi Chowk will be completed?
|
Starred | Communication |
National | 3 | 28 | 8 |
(a) whether it is a fact that OGDCL and its contracting company is not providing jobs to local tribal people by protecting their rights in the process of exploration of Oil and Gas in erstwhile merged area F.R Lakki Marwat, Tehsil and Sub-Division Betni, Gazgoba;
(b) if so, the steps being taken by the Federal Government to end deprivations of local people; and
(c) the steps taken or being taken by the oil companies for protection from environmental pollution, social responsibility and welfare and for providing due share to the local tribs?
|
Starred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
Will the Minister for Science and Technology be pleased to state:
(a) the function, responsibility and performance of the Pakistan Standards and Quality Control Authority (PSQCA);
(b) the details of the action taken against the manufacturers for substandard quality, particularly pharmaceutical and food products, during the years 2018 and 2019; and
(c) what are the PSQCA’s powers of fine and other punishment in this regard please?
|
Starred | Science and Technology |
National | 3 | 28 | 8 |
(a) whether it is a fact that number of transformers, installed in District Hyderabad are overloaded, consequently residents of the district have been facing great difficulties and relevant authorities have failed to do the needful;
(b) if so, is there any assessment has been made in recent times to rationalize the electricity load on transformers in aforesaid district; if so, the details thereof; if not, the reasons thereof; and
(c) if such assessment has been made, the stage-wise time frame, in which load management on the transformers in aforesaid district will be rationalize?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
(a) steps taken or being taken by the Division to prepare subject- wise list of titles of all laws and rules of subject matters made with reference to business allocated to the said Division and its attached departments under the Rules of Business, 1973;
(b) present status of provision of subject-wise list of titles of said Laws/Rules;
(c) what steps have been taken by said Division to update consolidate/amend said Laws/Rules to keep pace with changes in modern Society; if so, details thereof; if not, reasons thereof;
(d) the steps taken or being taken by said Division to determine anomalies, inconsistencies and difficulties in the administration
and implementation of said Laws and Rules; if so, details of the latest post legislative scrutiny of laws made by Division; and
(e) names of offices/branches appointed or designated thereof
|
Starred | Human Rights |
National | 3 | 28 | 8 |
(a) whether relevant authorities of Ministry conducted any study to determine magnitude of accidents on Motorways and Highways and identified reasons behind increasing trend of accidents; if so, the details thereof; if not, the reasons thereof;
(b) steps being taken by the Government to reduce the ratio of accidents on Highways and Motorways; and
(c) steps being taken to set up Rescue Centers on Motorways and Highways at a prudent appropriate distance?
|
Starred | Communication |
National | 3 | 28 | 8 |
Will the Minister for Energy (Power Division) be pleased to state:
(a) the names of the taxes collected on electricity being charged from consumers at present alongwith the rate thereof; and
(b) the justification of levying those taxes?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
Will the Minister for Energy (Power Division) be pleased to state:
(a) the total number of villages of District Buner where electricity has been supplied under Khushal Programme-II;
(b) the number of villages out of the above said whose electricity supply schemes have been completed, as well as the detail of those whose electricity supply schemes, have not been completed; and
(c) the expenditure incurred on the said schemes along with the reasons for returning funds?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
(a) whether it is a fact that electricity of almost whole locality is disconnected, due to few consumers/individuals do not pay their bills or get connection of electricity by illegal means;
(b) if so, whether such arrangements of powers companies are unjust with consumers of the particular locality, as they pay their bills regularly;
(c) whether such arrangements are tantamount to violation of Constitution, as it deprives fundamental right of law abiding citizens; and
(d) if the answers to part (a), (b) and (c) above are affirmative, what corrective measures are being taken by the Government in this regard to safeguard the fundamental rights of citizens?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
(a) the number of factories in Pakistan which manufacture or produce surgical masks;
(b) where these surgical masks manufacturing factories are located;
(c) the number of masks manufactured in Pakistan in one year; and
(d) whether surgical masks are imported from abroad to Pakistan?
|
Starred | Science and Technology |
National | 3 | 28 | 8 |
Will the Minister for Parliamentary Affairs be pleased to state:
(a) whether there is any proposal under consideration of the Government to increase the seats reserved for the Minorities; if so, details thereof; and
(b) the time by which aforesaid will be implemented?
|
Starred | Parliamentary Affairs |
National | 3 | 28 | 8 |
(a) the details of improvements, which were required to make in transmission system by Karachi Electricity (KE), as per agreement of privatization;
(b) whether or not such improvements were made by KE; if so, the details thereof; if not, the reasons thereof; and
(c) whether or not KE held accountably; if it could not make due improvements in their system?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
(a) the total number of scientists of international repute in Pakistan and the name of the fields being looked after by them;
(b) the practical steps being taken by the Government to improve the standard of technology in Pakistan; and
(c) the policy options available with Pakistan in the field of technology which can be helpful for the progress of Pakistan?
|
Starred | Science and Technology |
National | 3 | 28 | 8 |
(a) what criteria is being observed for load shedding/management in each of the DISCOs;
(b) the number of feeders category-wise i.e domestic, industrial in each of load management category in each of the DISCOs; and
(c) whether it is a fact that shut downs are being availed/allowed without written authorization of concerned SDOs/XENs in some of the DISCOs?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
(a) whether the children of below fifteen years age can be employed; and
(b) whether is there any law available at present in this regard or any legislation under consideration of the Government?
|
Starred | Human Rights |
National | 3 | 28 | 8 |
(a) the company-wise oil depots operating in GASBA Gujrat, District Muzaffargarh;
(b) do these oil depots follow rules of the minimum distance from an oil refinery;
(c) whether the CSR rules have been set out for such oil depots; if so, whether such rules are being followed in letter and spirit; if yes, the details thereof; if not, the reasons thereof;
(d) whether the Federal functionaries have visited sites of such depots to determine impact thereof on the lives of residents and physical infrastructure of the area, which has been badly affected due to heavy traffic of oil tankers, in recent times; if yes, the details thereof; and
(e) what protective measures are being taken by the Government to minimize negative impact of such oil depots on the lives of residents and physical infrastructure of the above area?
|
Starred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
(a) the province-wise total number of defaulters of sui Gas in the country at present; and
(b) the steps being taken by the Government to recover the outstanding dues from the said defaulters?
|
Starred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
(a) the province-wise total number of defaulters of sui Gas in the country at present; and
(b) the steps being taken by the Government to recover the outstanding dues from the said defaulters?
|
Starred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
(a) whether it is a fact that the silent language for the deaf and dumb children (special child) has been taughts differently in different areas;
(b) whether the Government intends to make arrangements for teaching the silent language in the same pattern/uniform way throughout in the Pakistan for the deaf and dumb children (special child); and
(c) if the answers to part (a) and (b) above are affirmative, the time by which the Government will complete the arrangements for teaching the silent language?
|
Starred | Human Rights |
National | 3 | 28 | 8 |
Will the Minister for Energy (Petroleum Division) be pleased to refer to the Starred Question No.38 replied on 19-10-2020 and to state:
(a) whether the Government is not capable to complete the demand of Gas in the country;
(b) if so, the reasons thereof?
|
Starred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
(a) the detail of amount of funds granted by the Prime Minister for the supply of Gas in NA-68 (which become NA-92 presently) during the period from 2013 to 2018; and
(b) the detail number of projects which have been completed and number of projects on which progress is going on?
|
Starred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
Will the Minister for Communications be pleased to state whether Motorway from Sukkar to Multan and from Faisalabad to Multan Motorway has been completed; if so, details thereof; if not, reasons thereof?
|
Starred | Communication |
National | 3 | 28 | 8 |
(a) the latest status of FIRs, which have been launched against the culprits of the theft of natural Gas;
(b) the decrease reported in the theft of natural gas both in terms of value and volume from the most effective areas of such theft during the tenure of incumbent Government;
(c) what steps are being taken to rationalize the supply of natural gas to most effective areas of such theft in KP in legal terms; and
(d) time by which, it will be completed?
|
Starred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
(a) whether it is a fact that despite completion of Neelum Jhelum Hydro Power Project, the Neelum Jhelum surcharge is still being charged on electricity bills;
(b) whether it is also a fact that FC surcharge, TR surcharge, LP surcharge, Television fee and General Sales Tax are also being charged on electricity bills;
(c) if the answers to part (a) and (b) above are affirmative, the reasons thereof;
(d) how much amount is collected in each surcharge including Neelum Jhelum surcharge and the details of its usage; and
(e) whether there is any plan to reduce the number and rate of surcharges on the electricity in near future?
|
Starred | Energy (Power Division) |
National | 3 | 28 | 8 |
Will the Minister for Energy (Petroleum Division) be pleased to state whether priority would be given to all of the locals in respect of the recent Gas discoveries in district Qallat, Balochistan?
|
Starred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
Will the Minister for Communications be pleased to state whether it is a fact that new Post Offices are being established in the new Districts of KP erstwhile FATA; if so, details of the newly proposed Post Offices in erstwhile FATA Districts?
|
Starred | Communication |
National | 3 | 28 | 8 |
(a) whether it is a fact that Peshawar High Court through its directions in 2011 and a decisions of the Federal Cabinet asked for dissolution of PEPCO; if so, the reasons for non- implementation of the above said decisions for dissolution of PEPCO;
(b) the legal status of PEPCO at present;
(c) the role and mandate of PEPCO in the energy sector;
(d) how far PEPCO has been successful in overseeing management of DISCOs;
(e) the specific role of PEPCO in the light of “Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 and amended Act of 2018 when GENCOs, NTDC, CPPA & DISCOs have their independent BoDs;
(f) the role of Power Division, PEPCO & BoDs of DISCOs in appointment and transfers of CEOs of DISCOs; and
(g) the role of NEPRA as a Regulator in DISCOs?
|
Unstarred | Energy (Power Division) |
National | 3 | 28 | 8 |
Will the Minister for Energy (Power Division) be pleased to state the details of disciplinary cases not yet finalized during last one year in WAPDA, PEPCO, GENCOs NTDC and DISCOs after lapse of prescribed period as per rules, their impact on the promotion and retirement of such officers and the time by which these cases will be finalized?
|
Unstarred | Energy (Power Division) |
National | 3 | 28 | 8 |
(a) number of applicants of the recently advertised vacancies of Bill Distribution and Assistant Lineman in Islamabad Electric Supply Company with qualification required to apply for;
(b) details of marks obtained in NTS test of each candidate appeared in tests of aforesaid vacancies; and
(c) complete details in all aspects including NTS and SSC marks of shortlisted candidates for interview of aforesaid vacancies with the criteria adopted in short listing?
|
Unstarred | Energy (Power Division) |
National | 3 | 28 | 8 |
(a) detail of increase made in the electricity bills during the last one year; and
(b) the detail of domestic and commercial consumers separately?
|
Unstarred | Energy (Power Division) |
National | 3 | 28 | 8 |
(a) the employees of Power Division and its attached department went abroad at the expense of Government during the last four years; and
(b) the detail of authority sent them abroad and the reasons therefor; and
(c) the amount incurred on each employees?
|
Unstarred | Energy (Power Division) |
National | 3 | 28 | 8 |
(a) whether the 5 percent quota allocated for the minorities is being implemented in HESCO;
(b) if so, the grade-wise number of the persons employed in the HESCO against the said quota during the last five years?
|
Unstarred | Energy (Power Division) |
National | 3 | 28 | 8 |
(a) the detail of annual progress report of oil refineries in district Karak; and
(b) the details of the contract?
|
Unstarred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
(a) the time by which funds will be allocated for provision of 150 yards 4 core cable to provide electricity connections to the remaining part of Qureshi Gali from Shafique Cotton Store to Raja Khuram Shahzad Home, Mohallah Afzalabad, centrail Jail Area, Haripur; and
(b) the time by which work will be started?
|
Unstarred | Energy (Power Division) |
National | 3 | 28 | 8 |
(a) the time by which 100 KV transformer approved by PESCO proposal No. 6411171 under work order No. 11-64464 will be installed in front of Raja Shamrooz Home, Qureshi Gali, Mohallah Afzalabad, Central Jail Area, Haripur; and
(b) the time by which work will be started?
|
Unstarred | Energy (Power Division) |
National | 3 | 28 | 8 |
Will the Minister for Human Rights be pleased to refer to the Un- Starred Question No. 30 replied on 10-02-2020 and to state:
(a) complete details of provision of late sitting claims to each Chowkidar in Schools of National Special Education, Islamabad from 2015 to till date;
(b) whether it is a fact that pending late sitting claims of Chowkidars for the year 2018-19, 2019-2020 are not paid to Chowkidars of National Special Education for having impaired children H-9, Islamabad; if so, reasons thereof; if not, complete details thereof; and
(c) steps being taken by the Government in terms of accountability and also provision of pending late sitting claims to poor Chowkidars of aforesaid School?
|
Unstarred | Human Rights |
National | 3 | 28 | 8 |
(a) the detail of Sui Gas pilferage during the last five years;
(b) the steps taken by the Government to control Gas pilferage; and
(c) whether the incidents of Gas pilferage have been stopped?
|
Unstarred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
Will the Minister for Energy (Power Division) be pleased to state whether loadshedding is being carried out in the country; if so, when it will be stopped completely?
|
Unstarred | Energy (Power Division) |
National | 3 | 28 | 8 |
(a) the last date till which connections of natural gas have been installed in Toba Tek Singh against the applications of ordinary consumer on merit basis;
(b) number of applications out of above are pending at present; and
(c) time by which rest of consumers will be provided the gas connections?
|
Unstarred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
(a) whether it is a fact that during the process of oil and gas discovery at Gazaoba merger area FR Luky Marwat, deforestation and purchase of piece of lands houses and forests etc. taken place from the trible persons;
(b) if so, the details of permission sought from the forest department and agreements made with the local persons;
(c) whether it is also a fact that no such practical have been steps taken for the welfare of local community and area alongwith
the negligence made to pay the appropriate amount for the piece of lands, houses and forests to the local tribal people; and
(d) the details of the steps taken by the Federal Government in this regard?
|
Unstarred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
(a) whether it is a fact that sui gas facility has not been provided to village Razi Dero, Tehsil Gambat, District Khairpur Mirs which is adjacent to Larkana Khairpur bypass situated very near to gas pipe line and the sui gas facility is available to its nearby villages vicinity;
(b) if so, whether any survey had been conducted for the provision of gas facility to the said village; if so, the detail thereof; if not, the reasons thereof; and
(c) the steps being taken by the Federal Government to lay natural gas pipe line in the aforesaid village and to provide sui gas connections to the local people as early as possible?
|
Unstarred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
(a) detail of residents, who applied for installation of meters of natural Gas on urgent basis of Chak No. 108/G.B, Tehsil Jaranwala, District Faisalabad since 2nd February, 2019;
(b) whether it is a fact that relevant department of SNGPL has failed to issue Demand Notices to the aforesaid residents even after the lapse of almost two years; if so, the reasons thereof; and
(c) the time by which the gas connections will be provided to above?
|
Unstarred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
(a) whether it is a fact that the domestic electricity consumers of Mahera Ali Khan, Tehsil and District Haripur neither receive monthly bills timely nor the said bills are sent on their residential addresses causing inconvenience to the consumers in depositing their bills in time;
(b) if so, the time by which the concerned office staff will be directed by the Government to deliver monthly bills in time to consumers at their already provided residential addresses?
|
Unstarred | Energy (Power Division) |
National | 3 | 28 | 8 |
(a) details of residents of village Musapur, Tehsil Pasrur, District Sialkot have deposited the amount of demand notices of Rs.6,000/- for installation of meter of natural gas since January, 2018;
(b) the present status of each of above applicant;
(c) whether it is a fact that several residents, who have deposited the aforesaid amount, could not the given connection of natural gas; if so, the reasons thereof; and
(d) time by which, each of above will provide connection of natural gas?
|
Unstarred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
Will the Minister for Energy (Power Division) be pleased to refer to the Un-Starred Question No. 24 replied on 23-10-2020 and to state:
(a) whether it is a fact that the Secretary of the Ministry has failed to act upon directions of High Court issued in writ Petition No.1758/2019, consequently, a mechanism could not be devised to revert back Government accommodations, which are occupied by the employees of WAPDA;
(b) if so, the reasons thereof; whether the failure of Ministry tantamount to contempt of the court;
(c) whether the Minister himself has taken notice of such failure; if so, the details thereof; and
(d) what steps are being taken by the Government to devise a mechanism with regard to aforesaid directions of the High Court and hold the accountable responsible for such failure?
|
Unstarred | Energy (Power Division) |
National | 3 | 28 | 8 |
(a) whether it is a fact that despite depositing the amount of demand notice under the Account IDs 10665433115 dated 06-08-2020, 14451222674 dated 25-08-2020, 6856055881 dated 19-03-2020,
03898190859 dated 04-08-2020, 75634682315 dated
10-08-2020, 26231813218 dated 26-08-2020, 15089935892
dated 26-08-2020 by residents of Chak No.81/JB, Pandoori Pansra, Dijkot Road, Faisalabad and Chak No.82/JB Jaggat Pur, Pansra, Dijkot Road, Faisalabad, and No. 15089935892 Dated 26-08-2020, No. 64220082115, dated 19-09-2019 by the
residents of Bota Basti Chak No.275/JB, Pansra Road Tehsil and District Faisalabad, the authorities concerned have failed to install meters of natural Gas against aforesaid demand notices;
(b) if so, the reasons thereof; and
(c) what steps are being taken to install meters against aforesaid demand notices at an earliest?
|
Unstarred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
Will the Minister for Science and Technology be pleased to state whether there is any mechanism of periodically water quality monitoring programme; if so, the details thereof; if not, reasons thereof?
|
Unstarred | Science and Technology |
National | 3 | 28 | 8 |
Will the Minister for Energy (Power Division) be pleased to state the time by which LT polls, will be provided for the Street Nos. 2, 3 and 4, Moosa Town, Saifia Road, Tarnol, Islamabad?
|
Unstarred | Energy (Power Division) |
National | 3 | 28 | 8 |
(a) whether it is a fact that due to numerous time breakage of water pond during the process of drilling for the discovery of Oil and Gas reserves by OGDCL and its contracting company chemical mixed water has been mingled with the water of local spring in merger area F.R Lakki Marwat, Tehsil and Sub-Division Betni, Gazgoba;
(b) whether it is also a fact that the poisonous water of the above said spring has caused the death of numerous humans as well as animals, if so: and
(c) what steps are being taken by the Government in order to held the accountable responsibles and to compensate the losses of local tribes?
|
Unstarred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
(a) whether it is a fact that despite depositing the amount of demand notices of Rs. 25,000/- and subsequent amount of Rs. 6,000/- under the Account IDs 67236876958 dated 01-09-2020, 51132739742 dated 01-09-2020, 28947122371 dated
01-09-2020 and 51397588511 dated 05-10-2020 by residents of Chak No. 114/RB, Gill Chak Tehsil Sanglahill District Nankana Sahib and Chak No. 82/JB, Noorangabad, Tehsil and District Faisalabad respectively the authorities concerned have failed to install meters of natural Gas against aforesaid deposit;
(b) if so, the reasons thereof; and
(c) what steps are being taken by the Government to install meters against aforesaid demand notices at an earliest
|
Unstarred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
(a) whether it is a fact that despite depositing the amount of demand notices of Rs. 25,000/- to get connection of natural Gas on urgent basis, the subsequent demand notice of an amount of Rs. 6,000/
- is not being issued by the relevant authorities concerned against the Account ID 21541232209 dated 28-07-2020 by residents of
H. No. 976, St. No. 34, Sector M3(a) Lare City Raiwind Road, Lahore, Account ID 35528784024 dated 28-08-2020, Chak No.
88. JB, Hussaina Tehsil and District Faisalabad, Account ID 61659040713 dated 10-08-2020, ST4 Bobuwala, Jhang Road, Faisalabad, Account ID 87004444177 dated 11-09-2020, Chack No.89/GB, Jaranwala, Tehsil and District Faisalabad;
(b) if so, the reasons thereof; and
(c) what steps are being taken to do the needful at an earliest?
|
Unstarred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
(a) whether it is a fact that despite the lapse of almost three years, the authorities concerned have failed to issue demand notices for installation of meters of natural gas of different consumers of Chak No.82/JB Jaggatpur, Dijkot Pansra Road, Faisalabad and Anwar Town, Near Masjid Burewala, District Vehari, who had applied for the connection of natural gas under Customer IDs 1207753685 dated 13-03-2017, 3529972814 dated
31-08-2017, 1200468699 dated 27-09-2017, 5050105395 dated
27-10-2017, 8861906517 dated 27-12-2017 and 99936622887
dated 22-05-2017;
(b) if so, the reasons thereof; and
(c) what steps are being taken by the Government to do the needful at an earliest?
|
Unstarred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
(a) details of residents of Chak No.88/JB, Hussaina Tehsil and District Faisalabad, who applied for installation of meters of natural Gas on urgent basis since 8th July, 2019;
(b) whether it is a fact that relevant department of SNGPL has failed to issue demand notices to aforesaid residents so far; if so, the reasons thereof; and
(c) time by which the needful will be done?
|
Unstarred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
Will the Minister for Communications be pleased to state:
(a) whether there is any proposal under consideration of Government to construct Motorway/National Highway from Salam Interchange to Sargodha;
(b) if so, time by which same will be constructed?
|
Unstarred | Communication |
National | 3 | 28 | 8 |
Will the Minister for Communications be pleased to state the reasons for constant increase being made in the rates of Toll Tax on the Motorways in the country?
|
Unstarred | Communication |
National | 3 | 28 | 8 |
Will the Minister for Communications be pleased to state the reasons due to which rest areas are still not operating along Lahore to Abdul Hakeem Motorway?
|
Unstarred | Communication |
National | 3 | 28 | 8 |
(a) whether it is a fact that despite depositing the amount of demand notice under the Account IDs 39842214627 dated 16-12-2019, 80627871983 dated 06-01-2020, 27127968702 dated
08-01-2020, 84214063756 dated 27-01-2020, 23740759891
dated 04-02-2020, 27190320930 dated 04-02-2010,
57956155428 dated 20-02-2020, 15621669298 dated 02-03-2010
by residents of Chak No.81/JB, Pandoori Pansra, Dijkot Road Faisalabad, as the authorities concerned have failed to install meters of natural Gas against aforesaid demand notices;
(b) if so, the reasons thereof; and
(c) what steps are being taken by the Government to install meters against aforesaid demand notices at an earliest?
|
Unstarred | Energy (Petroleum Division) |
National | 3 | 28 | 8 |
(a) what are the scheduled reading dates issued for each month since September, 2019 of the whole UC-2 Ghakka Meter, Pathan Wali Wazirabad in Pakistan including against the Reference No.02122321203500-R, which is located in GEPCO’s Division Wazirabad and Sub-Division Wazirabad-II;
(b) what are the reading dates printed in the bill for each month, since September, 2019 for the above reference number;
(c) what is the actual reading dates for each month since September, 2019 for the above reference number; and
(d) whether the scheduled and actual reading dates have been observed in compliance with the provisions of consumer service rules manual against the above UC-2, Ghakka Meters Pathan Wali Wazirabad and also in the aforesaid reference number?
|
Unstarred | Energy (Power Division) |
National | 3 | 28 | 8 |
(a) whether it is a fact that low voltage transformer is installed in new Lalazar, Line-8, Gali No.1, Near Fouji Foundation University due to which voltage is not to fulfill the supply of required voltage of electricity alongwith the problems of electric tripping remains frequent;
(b) if so, the time by which high voltage electricity transformer will be installed overthere at an earliest?
|
Unstarred | Energy (Power Division) |
National | 3 | 28 | 8 |
(a) the names and designations of employees who posted on deputation in NHA at present; and
(b) the dates of such deputationists alongwith the reasons thereof?
|
Unstarred | Communication |
National | 3 | 28 | 8 |
Will the Minister for Communications be pleased to state the location- wise new national highways are under construction throughout the country at present?
|
Unstarred | Communication |
National | 3 | 28 | 8 |
(a) whether it is a fact that the Customer ID Nos.5464737831 dated 28-06-2011, CNIC No.13101-0946883-7 resident of Dheri Maira, Muslimabad, Havelian, Abbottabad applied for Gas connection and despite the application for issuance of demand notice and also other inhabitants to concerned department has so far been failed to issue the same, if so; and
(b) the reasons of not issuing the demand notice to above alongwith the steps being taken by ministry to provide the connection to the said customers?
|
Unstarred | Energy (Petroleum Division) |